Call us at

+61 447 064 489

Gucci David Jones, Melbourne

Project Details

The key requirement at both Gucci fitouts was absolute precision. Expectations were for the highest level of professionalism and excellence in every aspect, from the exquisite glasswork in the shop fittings to the communication at each stage.

Gucci David Jones required a retail fitout in a very tight timeframe and was completed in just 72 hours. The project included defitting the existing tenancy, and packing and storing all furniture to go offsite.

Spacez patched the floors to ensure they were level, and while floors were laid received all the specialty Gucci joinery. The team then constructed and fitted the new joinery items and glasswork to create a dazzling retail space.

Gucci Chadsone required Spacez to conduct site establishment and install a new subfloor in order to create new luxury floor finishes. Spaces installed all furniture and joinery at Gucci Chadstone, and provides ongoing shop maintenance for the store.

The Spacez team delivered a full range of construction services on the project, and were proud to tackle every aspect down to the smallest detail with professionalism and care.

This fitout project was extensive, from preliminary demolition and internal slab pouring to the installation of structural works for the lift shaft and mezzanine floor.

Completion Date :
Category/Industry : Retail Fitout
Project size (m2) :
Client : Gucci David Jones, Melbourne

Services completed

  • Defit
  • Site establishment
  • Joinery
  • Hoardings
  • Floor patching
  • Installation of a subfloor
  • Glasswork
  • Furniture
  • Maintenance